What Developers Should Know About Signage Budgets

Far too often, signage budgets feel harder to pin down than other scopes. They start as ballpark allowances, shift during value engineering, and are frequently revisited late in the process when it’s finally time to go find a signage collaborator. Depending on how ownership is structured, this administrative responsibility can end up on the desks of the interior designer, in-house marketing, or the design architects, but often times it ends up near the bottom of the construction PM’s to-figure-out-soon punch list. In these situations, by the time signage is fully defined, the numbers can appear to move even when no one feels like decisions have changed. Why is that?

This perception is understandable. Signage is one of the few scopes on the project whose cost is not driven by a single factor. It’s the result of several overlapping constraints that often come into focus at different times along the process.

Understanding how those constraints interact is key to building an accurate signage budget the first time.

Why signage budgets often begin as allowances

In early phases, signage is usually scoped before critical information is available. Quantities may be estimated. Locations may be provisional. Power, mounting conditions, and code requirements may still be unresolved.

In that context, an allowance is a placeholder for incomplete information. This is completely understandable. Problems arise when allowances are treated as fixed numbers rather than provisional ones and continue to get pushed through budget meetings unchecked. As design progresses and unknowns become known, the signage scope becomes more specific. The budget responds accordingly. What feels like escalation is often clarification.

What actually drives signage cost

Signage cost is not determined by material alone. A modest material executed across many conditions can cost more than a premium material used sparingly.

The primary drivers tend to include:

  • the number of distinct sign types, not just total sign count 

    • (how many kinds of signs are there?)

  • fabrication complexity relative to tolerance and finish expectations 

    • (how complex is the fabrication?)

  • electrical scope and integration with lighting systems 

    • (is it illuminated?)

  • installation conditions, access, and required equipment 

    • (does the city require a lane closure and traffic control officer?)

  • regulatory requirements that affect size, placement, and construction 

    • (what does the zoning board allow at this parcel address?)

What an early-but-accurate signage budget actually requires

What we’re advocating for here is a better understanding of the inputs that inform a signage budget. When those inputs are visible (see “primary drivers” above), signage becomes far easier to plan for and far less intimidating to discuss.

It also helps to separate what is unknown from what is simply undecided. Unknowns tend to resolve themselves as design continues to progress. Undecided items often linger until late in the process and can create the perception of budget volatility. Making that distinction early allows all teams to assign contingency intentionally (often in the form of pre-determined allowances) rather than reactively.

For the developers we work with, this perspective shift is significant. Instead of viewing signage as a scope that resists definition, it becomes a scope that rewards clarity and intentionality. That change in posture alone removes much of the friction that surrounds signage late in a project.

Signage is rarely, if ever, the most expensive scope on a project, but it is undeniably one of the most visible. Understanding how its costs are formed allows teams to plan more deliberately and avoid unnecessary costs later.

As you have probably deduced by now, we love joining the design party early. If you are in the early stages of a hospitality or mixed-use project and need a signage budget grounded in real constraints rather than assumptions, we would love to hear about it.

Submit a project request.